Year 2 – The Next Twelve Month 13 Cement pump for the floors Ready for cement Floor is done and drywall too Month 14 Drywall And more drywall Cement work Month 15 Ceiling boards Walls boarded in the sun room, too The chimney is finally connected Garage is also coming along Garage loft spray foamed The generator getting hooked up Month 16 Snow has come Toys Solar panels being installed Utility room progress Battery room progress. Brains…. Interior doors arrive And get installed The kitchen. Some assembly required. Top Month 17 Kitchen cabinets up. Bathroom cabinets too. Window seats Solar panels mounted. The Kilometer of Fun, well cleared, but not by me. New tractor Now I can move snow! Month 18 Solar panels pointing in the right direction Solar collectors being installed Septic system work Some inside work got done, too. Month 19 Railings First fire! Lights Lights Light Fan with light Loft over garage progress Outside railings Well pump replaced during -30C temp and strong wind, resulting in running water by end of day! Month 20 Appliances Sunroom fan Bathrooms tile & glass and radiator in back hall Backroom divider, up and down Utility room Month 21 Getting there(Note green bag of gas station wood) Good wood, no more green bags. Melted bit caused power failure Lost a boot in the mud.I had to be rescued! Month 22 Ready for lunch Mud and garbage First over nighter More loft progress Deer and mud The snow came back Month 23 Ready to mow Mowed More mud and crud Month 24 Got the tractor stuck Got the tractor unstuck Lights in the loft Like a real bathroom Towels and all Bedroom ready to go, too Still messy End of year 2 Top