Year 1 – The First Twelve Months

Month  1           Just put it over there.
The cottage is here, the cottage is here!
First load.
Some Assembly Required
Month 2                       The couch will go there.
Start of Month 3            Load #2
Footings
OCC  foundation
Month 4 Um
Month 5   Soooo…
Month 6         Floor joists.
End of month 6.
Month 7          A new crew.
First look out of the front windows.
Roof joists.
Month 8     Glass and Doors
Some tin on the roof.
Garage progress too!
Month 9
Masonry heater kit delivered,
along with a snow blade, ready for next season.
Month 10 Folding doors installed.
A sump tub ready to be installed.
Decks and stairs to the garage loft.
Month 11         Starts nice and green, soggy and messy.
Toys…. 🙂
Lets move some weeping tile.
Month 12  Shower stall 2 B.  Don’t look outside.
Hey the solar panel poles are up.
And the weeping tile is day-lighted!
Time to make it look pretty again.
At the end of twelve months.