Year 1 – The First Twelve Months Month 1 Just put it over there. The cottage is here, the cottage is here! First load. Some Assembly Required Month 2 The couch will go there. Start of Month 3 Load #2 Footings OCC foundation Month 4 Um Month 5 Soooo… Month 6 Floor joists. End of month 6. Month 7 A new crew. First look out of the front windows. Roof joists. Month 8 Glass and Doors Some tin on the roof. Garage progress too! Month 9 Masonry heater kit delivered, along with a snow blade, ready for next season. Month 10 Folding doors installed. A sump tub ready to be installed. Decks and stairs to the garage loft. Month 11 Starts nice and green, soggy and messy. Toys…. 🙂 Lets move some weeping tile. Month 12 Shower stall 2 B. Don’t look outside. Hey the solar panel poles are up. And the weeping tile is day-lighted! Time to make it look pretty again. At the end of twelve months. Top